JPM-Rio Tinto Limited 2Q25 First Take:Iron ore shipments a slight miss-20250716

查看原始报告

这篇研报讲什么?

摘要原文摘录

Key takeaways: 1) Iron ore shipments of ~80Mt (320Mtpa rate) were a 4% missvs JPMe, while production of 83.7Mt was broadly in-line with our forecasts. 2025shipments are still expe…

研究对象钢铁
发布机构摩根大通
分析师Lyndon Fagan,Al Harvey,Devwrat Vegad
发布日期2025-07-16
原始报告提供原始报告入口

机构观点归属摩根大通,研报雷达仅作摘要整理与机构观点聚合。以下为研报摘要原文摘录,内容以原始报告为准。

研究对象钢铁
股票代码不适用
公司共识评级样本不足近 180 天暂无有效评级
一致目标价样本不足近 180 天暂无有效目标价

研报摘要

摘要原文以原始报告为准

Key takeaways: 1) Iron ore shipments of ~80Mt (320Mtpa rate) were a 4% missvs JPMe, while production of 83.7Mt was broadly in-line with our forecasts. 2025shipments are still expected to be at the lower end of guidance (323-338Mt) dueto cyclone impacts in 1Q. The achieved 1H iron ore price of $82.5/t was ~$1/tbelow our forecasts; 2) Mined copper production of 229kt beat our forecast by11%, due to strong performance at OT and Kennecott. 2025 mined copperproduction is expected at the upper end of guidance (780-850kt), and unit costs areexpected at the lower end, 3) Aluminium (842kt) and TiO2 (269kt) productionwere 2% below JPMe. Bauxite production of 15.6Mt was a 4% beat vs JPMe andthe highest quarter of production on record with Amrun running above nameplatecapacity. 2025 bauxite production is guided towards the upper end of the 57-59Mtrange. RIO has flagged a $0.6bn working cap build. Overall, we view the quarterlyas solid, and expect consensus earnings to move higher on copper production andunit cost and bauxite production, albeit aluminium tariffs could be an offset asanalysts wash this through. RIO is Overweight rated.

同公司研报

继续比较不同机构对同一公司的判断。

进入公司页

同行业近期研报

从单家公司继续回到行业研究。

进入行业专题