行业研报钢铁有原文

MS-Kumba Iron Ore 3Q25 Good volumes, miss on price realisations-20251028

查看原始报告

这篇研报讲什么?

摘要原文摘录

Kumba report total iron ore production of 9.25Mt and sales of 9.6Mt. Our estimate was for production of 9.1Mt and sales of 9Mt. This print is ahead of our estimates.

研究对象钢铁
发布机构摩根士丹利
分析师Brian Morgan,Christopher Nicholson
发布日期2025-10-28
原始报告提供原始报告入口

机构观点归属摩根士丹利,研报雷达仅作摘要整理与机构观点聚合。以下为研报摘要原文摘录,内容以原始报告为准。

研究对象钢铁
股票代码不适用
公司共识评级样本不足近 180 天暂无有效评级
一致目标价样本不足近 180 天暂无有效目标价

研报摘要

摘要原文以原始报告为准

Kumba report total iron ore production of 9.25Mt and sales of 9.6Mt. Our estimate was for production of 9.1Mt and sales of 9Mt. This print is ahead of our estimates.

Update on guidance: Kolomela costs to be below guided. 2025 production is still guided at 35-37Mt (VA consensus is 36.4Mt) and sales of 35-37Mt. Given the stronger rail performance, Kumba is tightening this guidance to the higher end of the range. Sishen unit costs are guided at R510-540/t (VA consensus is R534/t. At Kolomela, prior guidance was R430-460/t (VA consensus is R434/t). Without providing specific numbers, the company has suggested costs may beat this range due to stronger production.

同公司研报

继续比较不同机构对同一公司的判断。

进入公司页

同行业近期研报

从单家公司继续回到行业研究。

进入行业专题