行业研报有色金属有原文

UBS-Hochschild Mining PLC Gold silver leverage operational improvement-20251017

查看原始报告

这篇研报讲什么?

摘要原文摘录

Potential to 'catch-up' as market stretches for cheap valuation & improvement

研究对象有色金属
发布机构瑞银集团
分析师Daniel Major,Myles Allsop,Amy Yi Li
发布日期2025-10-17
原始报告提供原始报告入口

机构观点归属瑞银集团,研报雷达仅作摘要整理与机构观点聚合。以下为研报摘要原文摘录,内容以原始报告为准。

研究对象有色金属
股票代码不适用
公司共识评级样本不足近 180 天暂无有效评级
一致目标价样本不足近 180 天暂无有效目标价

研报摘要

摘要原文以原始报告为准

Potential to 'catch-up' as market stretches for cheap valuation & improvement

HOC has had a challenging 12m missing guidance at Mara Rosa in 2024, further issues at Mara Rosa have led to downgrades to 2025 guidance and we expect the mine to remain well below nameplate capacity in 2026. Poor operational performance has been overwhelmed by the bull market in gold/silver; but HOC has still underperformed peers with the stock only up 115% YTD vs GDX +140%, FRES +375% & EDV +170%. We are increasingly nervous of excessive short-term enthusiasm in the gold trade (LINK);assuming high prices persist but the recent run of relentless positive price momentum moderates; in our view equity investors are likely to search for 'laggards' with cheap valuation and operational turnaround potential against low market expectations. In our view HOC meets this criteria and scarce exposure to silver is likely to support renewed investor interest as market searches for 2nd/3rd derivatives of gold for more leverage.

Mara Rosa: After a ~4 week shutdown in in June production resumed in July using two of the four tailings filters and the remaining two expected to restart in October. The installation of a tailings thickener is planned for H126 that will enable the plant to reach full capacity. We assume throughput is constrained to <5ktpd until the the thickener is installed and assume 1H26 production of ~25koz, lifting to ~40koz in 2H, as a result we forecast FY26 production fo 65-70koz. We see modest downside to FY26 consensus of 78koz (only 4 contributors), but after poor execution we believe expectations have been reset lower and see a path towards ramping back towards nameplate capacity (7koz per day) after the tailings thickener has been put in place in 1H26.

同公司研报

继续比较不同机构对同一公司的判断。

进入公司页

同行业近期研报

从单家公司继续回到行业研究。

进入行业专题