BofA-Centerra Gold Q125 results:EPS in-line to consensus and 2025 guidance held despite softer Q1-20250506
这篇研报讲什么?
摘要原文摘录Kemess a potential capital allocation priority
机构观点归属B of A Securities,研报雷达仅作摘要整理与机构观点聚合。以下为研报摘要原文摘录,内容以原始报告为准。
研报摘要
Kemess a potential capital allocation priority
Centerra Gold (CG) reported Q1’25 adjusted EPS that was in line with consensus. Reportedproduction numbers were below forecasts (though sales exceeded production), and cashcosts skewed higher. Full-year 2025 guidance was maintained despite a soft start. Netcash declined as capital return (via the dividend and share buybacks) was prioritized. Anupdated resource estimate on the Kemess property increased the total (measured andindicated + inferred) contained gold resource by 9% to nearly 5 million ounces (Moz);contained copper was unchanged at 813 thousand tonnes. A preliminary economicassessment (PEA) on a potential restart is to be complete by year-end. Grades are very low(at 0.38 grams per tonne gold and 0.20% copper) but current commodity prices, existinginfrastructure, and cheap power could make it work. We maintain our Underperform ratingwhich considers CG’s short reserve life and light relative project pipeline in gold.
同公司研报
继续比较不同机构对同一公司的判断。
同行业近期研报
从单家公司继续回到行业研究。